Project Update from our Member SME Logistics

De-oiled Filter Vessels & Skids in total 28 packages/2,242cbm/288 Tons.

Due to the limitation in width and height of cargoes, it was impossible to transport cargoes from fabricator to the port of loading by land. To tackle the problem, their experienced specialists did decide to shift all skids and vessels to a jetty near by the fabricator before the cargoes were loaded onto barges by combination of 2 mobile cranes. All operations were taken place smoothly as an example of their ability in handling heavylift cargo. The safety is always their priorty in every movement of cargo.

Keep it up SME Logistics.

#epn #network #smelogistics #project #cargo